Ground-Mounted Solar Installation
Free-standing arrays on frames or screw piles, where the roof is unsuitable and the land is not.
When the ground beats the roof
Some roofs cannot take an array. They face north, they are overshadowed by a mature oak, they are listed, they are Cornish slate at the end of its life, or the rafters are undersized and strengthening them costs more than the panels.
Where there is usable land, a ground mount removes all of those constraints at once. It also removes scaffolding, gives you free choice of orientation and tilt, and puts every component within reach of someone standing on grass.
What it adds is groundwork, a cable run, and a planning question.
Choosing the position
The position is a compromise between four things.
- Shading. Ground level sees more obstruction than roof level. Hedges grow, neighbouring boundaries have fences, and a low winter sun is blocked by things that are irrelevant in June. We assess shading across the whole year, not on the day of the survey.
- Distance. Every metre is trench, duct and cable. It is rarely a technical problem and always a cost.
- What the trench crosses. A run across lawn is simple. A run under a gravel drive, a patio, a mature root protection area or an existing service is not.
- What you want to look at. Arrays are large and dark and they do not disappear into a garden. Where it goes matters as much for living with it as for generation.
Foundations
The frame has to resist both the weight of the array and the wind trying to lift it, and that resistance comes from the ground.
Screw piles are the usual answer. Helical steel piles wound into the soil, with no concrete, no spoil to dispose of, and immediate load-bearing capacity. They suit most reasonable soil, they can be adjusted for level, and they can be removed if the array is ever taken away.
Concrete pads or ballast take over where screw piles cannot get purchase — shallow soil over rock, heavily made-up ground, or sites where digging is restricted. They are heavier, slower and more disruptive, but they work where nothing else will.
Ground conditions decide this, which is why a proper look at the site precedes any quotation.
The cable run
Running DC from the array to an inverter near the house is generally more efficient than converting at the array and running AC, because the higher string voltage means lower current and lower losses for the same power.
Whichever approach is used, the cable is sized for the run, not chosen from habit. Voltage drop over eighty metres at the wrong cable size quietly costs generation for the life of the system. Cable goes in duct or as armoured cable, at a proper depth, with marker tape above it so the next person with a spade knows it is there.
Planning
This is the part that most often changes the plan. Permitted development rights for a standalone array at a house exist but are narrow — limited in footprint and height, normally one installation per property, and restricted close to boundaries and in designated areas. Listed buildings and conservation areas bring further constraints.
We check the position before design work starts. Where an application is needed we will tell you what is likely to matter to the case officer — visibility from public vantage points, the relationship to boundaries, and screening — but the application itself is yours to make or to appoint someone for.
Living with it
Ground arrays need a little more attention than roof arrays. Grass grows and shades the lower row. Mud splashes onto the bottom edge of the panels in winter. Livestock lean on frames, and rabbits find cables interesting. None of these are difficult problems, but they are why we specify frames with adequate clearance and route cable where nothing can chew it.
Who this is for
- Properties with a roof that is shaded, wrongly oriented, listed or structurally unsuitable
- Smallholdings, paddocks, barn conversions and larger gardens
- Owners who want the array serviceable from ground level
- Sites where a larger array is wanted than a roof could hold
What is included, and what is not
Included as standard
- Site survey covering ground conditions, levels, shading and the cable route
- Shading assessment across the year, including hedges, trees and buildings
- Foundation design, whether screw piles, concrete pads or a ballasted frame
- Frame, panels, and DC cabling in buried duct or armoured cable
- Trenching, cable installation, backfill and marker tape
- Voltage drop calculation and cable sizing for the run to the house
- Inverter, isolation, protection and consumer unit connection
- Commissioning, MCS certification and DNO notification
Not included
- Planning application fees or the preparation of a full application
- Tree or hedge removal to clear shading
- Fencing, gates or security provision around the array
- Reinstatement of hard landscaping beyond backfilling the trench
- Ground investigation where unusual conditions are suspected
Anything in this column that your property turns out to need is identified at survey and priced in the written quotation, not raised later as a variation.
Timescale
Typically three to five days including foundations, trenching and reinstatement, weather permitting.
What affects the cost
| Factor | Why it matters |
|---|---|
| Foundation type, which follows ground conditions rather than preference | Assessed at survey and reflected in the fixed written quotation. |
| Distance from the array to the building and therefore the cable run | Assessed at survey and reflected in the fixed written quotation. |
| Whether the trench crosses driveways, paths or services | Assessed at survey and reflected in the fixed written quotation. |
| Frame height, which affects wind loading and material | Assessed at survey and reflected in the fixed written quotation. |
| Array size and whether the site is level | Assessed at survey and reflected in the fixed written quotation. |
| Whether planning consent is required and what it conditions | Assessed at survey and reflected in the fixed written quotation. |
New to this? Start with how domestic solar works and what battery storage changes, then come back to the detail.
Common questions
Do I need planning permission for a ground-mounted array?
More often than for a roof array. Permitted development rights for a free-standing installation at a dwelling are limited in area and height, generally allow only one such installation, and are restricted near boundaries, on listed buildings and in conservation areas and similar designations. Anything beyond those limits needs an application. We establish the position early because it sets the programme.
How far from the house can the array be?
Further than most people expect, provided the cable is sized for it. Voltage drop is the constraint, and running at the higher DC string voltage rather than at mains voltage helps considerably. The practical limits are usually the cost of trenching and what the trench has to cross, not the electrical distance.
What holds the frame down?
It depends on the ground. Screw piles wind into firm soil and give good uplift resistance with no concrete and minimal disturbance, which suits most sites. Where the ground is stony, made up, or shallow over rock, concrete pads or a ballasted frame may be needed instead. The choice follows what the survey finds.
Is a ground array easier to maintain?
Yes, in the obvious sense that nobody needs a scaffold. Cleaning, inspection and panel replacement are all straightforward. Against that, ground arrays collect more from below than roof arrays do, so vegetation control, splash-back and animal interference need attention that a roof array never asks for.
Related services
- Solar panel installationSurvey, design, roof works, electrical works and commissioning for a domestic solar PV system.
- Solar panel maintenanceScheduled servicing of the whole system — array, fixings, DC side, inverter and monitoring — not just the glass.
- Commercial solarRooftop and ground arrays for businesses, designed around the site load profile and the grid connection available.
The technology behind it
- Mounting systemsHooks, rails, clamps and fixings — the part of the installation that decides whether the roof stays watertight.
- Solar panelsWhat a domestic solar panel is, how it is built, and which specifications on the datasheet actually matter.
- String invertersThe conventional central inverter: how strings are designed, where it is the best value, and where it is the wrong choice.
- Power optimisersPer-panel DC electronics that keep conversion in one accessible box: the middle option between string and micro.
Property and roof guides
- Barn conversionsLarge uninterrupted roof planes, profile sheet or clay tile, long cable runs and rural supplies that shape what is possible.
- Listed buildings and conservation areasWhere permitted development rights are reduced or removed, listed building consent is a separate process, and design choices decide the outcome.
- North-facing and shaded roofsSometimes the answer is no. Where it is not, per-panel electronics, a different roof, an outbuilding or a ground mount.
Further reading
- Do I need planning permission for solar panels?When roof-mounted solar falls under permitted development, and the property types where consent is likely to be needed.
- Roof orientation and shadingHow aspect, pitch and obstructions change what a roof can produce, and what can be done about shading.
- How many solar panels do I need?Why panel count is set by your electricity consumption and the usable area of your roof, not by the size of your house.
Where we work
Information reviewed on 2026-08-23.
Book a free design and quotation
Tell us about the property and we will arrange a survey, then issue a written design and fixed quotation before any work is agreed.
Enquire about ground-mounted solar
No obligation. We will review the details, come back to arrange the next step, and issue a written design and fixed quotation before anything is agreed.
Prefer to talk? Call 0118 227 7444.