The part that happens before the drill comes out
Fitting a charge point to a wall is straightforward. Establishing that the supply can carry it, and that the earthing arrangement is safe for a substantial metal object being touched outdoors, is the actual work.
A domestic charge point is an unusual load. It draws close to its maximum for hours at a time, often overnight, often unattended. Nothing else in a house behaves like that, which is why the design rules for charge points are stricter than for a socket of the same rating.
Load assessment
Every installation starts with what the supply can carry. That means the rating of the main service fuse, the size and condition of the tails and consumer unit, and an assessment of maximum demand across the existing installation with diversity applied — the recognition that the shower, oven, immersion and kettle are unlikely to run flat out simultaneously.
A charge point does not benefit from diversity in the same way. It is treated as a continuous load, because that is what it is.
Where the sum exceeds what the service can supply, there are three routes:
- Load management. A current transformer on the incoming supply tells the charge point how much headroom is left, and the unit throttles down when the house demand rises. This is the usual answer and it works well.
- A reduced charging rate. Limiting the unit to a lower current permanently. Simple, and often perfectly adequate for overnight charging.
- A supply upgrade. The network operator’s job, not ours, and it carries its own cost and timescale.
Earthing and PEN fault protection
Most homes are supplied under a PME arrangement, where the earth for the installation is taken from the incoming combined neutral and earth conductor. It is a sound system with one specific failure mode: if that conductor breaks somewhere in the network, the earthed metalwork in the property can rise to a dangerous voltage relative to true earth.
Inside a house, main bonding keeps everything at the same potential and the risk is contained. Outside, standing on soil or a wet drive with a hand on a charging car, it is not. The regulations respond to this by requiring either a device that detects the voltage excursion and disconnects the charge point, or an installation method that gives the charge point its own earth electrode independent of the supply.
We establish the earthing arrangement at survey rather than assuming, because the answer changes the specification and the cost.
Smart charging requirements
Charge points sold for private use in the UK must meet smart charge point regulations. In practice that means default charging schedules that sit outside peak demand periods unless you deliberately override them, a randomised start delay of up to several minutes to stop thousands of cars switching on at once, retention of settings through a power interruption, and measurement and security requirements on the unit itself.
None of this restricts you in daily use — you can override a schedule whenever you want. It does mean that commissioning involves getting the unit onto your network and into your account, which is worth ten minutes of your time on the day.
Working with solar and storage
Where there is an array, the useful setting is the one that only charges from surplus. The charge point watches the export at the meter and matches it, ramping up on a bright afternoon and backing off when a cloud passes or the oven goes on.
It is genuinely useful, and it is genuinely slow. A modest array on a mixed day may deliver only a few kilowatt-hours into the car. Where there is a battery as well, the sensible configuration is a hierarchy: house first, then car from surplus, then battery, then export — or a different order, depending on your tariff. We set that with you at commissioning.
Who this is for
- Homes with off-street parking within a practical cable run of the supply
- Households with solar wanting surplus generation to go into the car
- Properties on time-of-use tariffs where overnight charging does most of the work
- Homes adding a second charge point where the supply can be managed
What is included, and what is not
Included as standard
- Supply and load assessment covering main fuse rating, existing loads and diversity
- Earthing arrangement check and appropriate PEN fault protection
- Charge point supply and installation with dedicated circuit protection
- Cable routing, containment and making good
- RCD protection appropriate to the charge point and its internal DC detection
- Load management or current limiting configuration where the supply requires it
- Network operator notification where the connection calls for it
- Commissioning, app setup, tariff scheduling and solar-matched charging where solar is present
- Electrical Installation Certificate and handover documentation
Not included
- Supply upgrades or main fuse changes, which are carried out by the network operator
- Consumer unit replacement where required, quoted separately after survey
- Groundworks or trenching for a detached garage or long external run
- Vehicle-side cables or adaptors not supplied with the charge point
- Off-street parking works or dropped kerb applications
Anything in this column that your property turns out to need is identified at survey and priced in the written quotation, not raised later as a variation.
Timescale
A straightforward installation is half a day; longer runs, load management or a new sub-circuit can take a full day.
What affects the cost
| Factor | Why it matters |
|---|---|
| Cable run length and how it can be routed or contained | Assessed at survey and reflected in the fixed written quotation. |
| Whether the earthing arrangement needs a protective device or an earth electrode | Assessed at survey and reflected in the fixed written quotation. |
| Condition of the consumer unit and availability of a spare way | Assessed at survey and reflected in the fixed written quotation. |
| Tethered or untethered unit and its power rating | Assessed at survey and reflected in the fixed written quotation. |
| Whether load management hardware is needed to stay within the supply capacity | Assessed at survey and reflected in the fixed written quotation. |
| Single-phase or three-phase supply | Assessed at survey and reflected in the fixed written quotation. |
New to this? Start with how domestic solar works and what battery storage changes, then come back to the detail.
Common questions
Why does the supply need assessing before you quote?
Because a 7kW charge point draws around 32A continuously, which is a substantial addition to a domestic supply. The assessment looks at the main fuse rating, the existing maximum demand with diversity applied, and what else in the house runs at the same time. Where the total would exceed what the supply can carry, the answer is load management rather than hoping the fuse holds.
What is PEN fault protection and why does it matter?
Most UK homes use a PME earthing arrangement, where the earth is derived from the incoming neutral. If that combined neutral and earth conductor fails in the street, exposed metalwork can become live. Indoors that risk is limited by bonding; outdoors, holding a car body while standing on the ground, it is not. Charge points must therefore either include PEN fault detection that disconnects the supply, or be installed with a separate earth electrode.
Do smart charging requirements affect what I can buy?
They affect what can legally be sold and installed. Charge points for private use must have smart functionality, default to charging outside peak periods unless you override it, apply a randomised delay to starting, and retain settings through a power cut. In practice this is built into the units, but it is why every current charge point wants a network connection during commissioning.
Can the charger run from my solar panels?
It can use surplus, which is different from running on solar. Most smart units offer a solar-matched mode that only draws what the array is exporting, throttling up and down as generation changes. Charging rates in that mode are modest and weather-dependent, so it suits topping up over a working day rather than a fast turnaround before a journey.
Can I have two charge points?
Often, with load management. Two unrestricted 7kW points on a typical single-phase supply is usually more than the service can carry alongside the rest of the house. Linked units that share a total current budget solve this, at the cost of both cars charging more slowly when they charge together.
Related services
- Solar and battery systemsPanels, hybrid inverter and storage designed as one system, on one scaffold, with one commissioning.
- Solar panel installationSurvey, design, roof works, electrical works and commissioning for a domestic solar PV system.
- Battery storage installationHome battery systems sized against your consumption, sited properly and commissioned with the tariff in mind.
The technology behind it
- Monitoring systemsWhat generation, consumption and battery data actually tells you, and what a system needs fitted to produce it.
- Hybrid invertersA single unit managing array, battery and house demand, and when fitting one is worth the extra cost.
- BatteriesHow home storage works, what determines whether it pays, and the specifications that actually matter.
Property and roof guides
- Post-1965 homesTrussed rafter roofs, concrete interlocking tile and modern electrics — the most straightforward housing stock to work on.
- New build homesRetrofitting or extending solar on a new build — structural warranty notification, shallow pitches, interrupted roof planes and covenants.
- BungalowsLarge roof area over a small floor plan, low eaves and easy access — with shading and consumption as the real limits.
See it on a real installation
Further reading
Where we work
Information reviewed on 2026-08-23.
Book a free design and quotation
Tell us about the property and we will arrange a survey, then issue a written design and fixed quotation before any work is agreed.
Enquire about ev charger installation
No obligation. We will review the details, come back to arrange the next step, and issue a written design and fixed quotation before anything is agreed.
Prefer to talk? Call 0118 227 7444.